Deep C Inc carries $2 million Cdn in business liability for wellsite and office.

exploitation development engineering oil and gas

Exploitation/Development Engineering

  • Installed an integral separator/dehy/choke gas plant smaller than the productive capacity of the well so that it uses well pressure to process the gas. This also balanced the capital risked against the uncertainty as to the size of the reserves
  • Economic Evaluation of oil & gas assets
  • Economic Evaluation of oil & gas potential locations & plays
  • Determining development of a new pool (well spacing & geometry) to best deplete reserves
    with minimum capital
  • Evaluation of Enhanced Oil Recovery Technologies like waterfloods & ASP (alkaline surfactant polymer) floods and their application to a specific pool/formation
  • Examine & view cores at the AER to understand viability of waterflooding or polymer flooding formation
  • Retrieve well information such as production, pressure tests, drilling and completion reports from the AER, also to examine & describe cores at the AER to assess inflow capability of formation for heavy oil acquisition
  • services

    Exploitation engineering, Production engineering, oil & gas evaluations

  • Clients

    From 1 person start-ups thru to integrated senior producers

  • Resumes

    With over 25 years experience from the field to the boardroom